Torque Approximately 300-OFF Flanges

SRU Incinerator (M7705) – Install Lap Patch

CO: Rep Mtce Clean Sw/House, Sub Stn, TX

Performing of Janitorial works (Dusting, sweeping, Mopping etc.) and Grass Maintenance of Switch Houses, Sub Stations, Transformer Enclosures, Generator Cages and Switch Enclosures in Conversion Asset

Renewal of Sections of 16 inch Utilities Field Gas Line and Associated Works

Renewal of ft of 16” piping before it can be put into service inclusive of pipe supports, weld build up, excavations of test holes, renewal of shields for bellows, blasting and coating and other associated works.

Clean Transformer Enclosures – Ref & Non-Ref

Weed Cutting, cleaning and clearing of all garbage and unwanted material from inside and around Transformer Enclosures, Air Brake Switches & Towers, Substations, Bulk Power Towers Enclosures and High Tension Poles with Cutout Isolators

Tank 129 – Excavate & Clamp Leaking 30” VGO Line

Manually excavate and locate leak and clamp 30: VGO Suction Line

Renew Hydrant Line – Foundry

Renewal of approximately 80ft of 4” Hydrant Line

Emergent Plant Fitting Works for SRU Plant

Carrying out emergent plant fitting works for start up of SRU Plant inclusive of removal of sulphur locks, Mudlegs, Blanking of nozzles and run down lines etc.

Repairs to Tank 4 Point Fortin

Replacement of piping 4” 400ft, 6” 320ft and 8” 200ft, Civil works around tank and the Repairs and Painting of TANK 4 which has a diameter of 48ft and Height of 38ft.

2VBU: Repair Steam Generator E8205A 2nd Rep

I solating, pulling of bundle for shop repairs, re-installation, testing and de-isolation of North Circulating SteaM Generator